In the final push of December, we will proceed with the cabinet installation, which student Tom has been preparing since summer. The interior will move on to painting, tiling, and plasterwork. Aimee’s preparations for the engawa (veranda) door will be finished, the water catchment (greywater system) will be installed, and we will install the rammed earth wall and stove, whose finishes we are eagerly anticipating. check the flooring ideas and samples.

Coming up ! - Photo 2

Engawa door design

Coming up ! - Photo 4

cabinets are ready to install

Coming up ! - Photo 6

Reveil rammed earth wall!

Coming up ! - Photo 8

Floor decoration idea around sliding door

Coming up ! - Photo 10

Natural Plaster sample with local harvested earthen material

Coming up ! - Photo 12

Tile sample made with Tim Hamilton 